Bathroom Renovation SE15 | Before (B), Process (P), After (A).
B: Sink and toilet.B: Damaged bathtub.B: Close up of toilet and sink.B: Sink, tiling, radiator.B: Shelving and tiling.B: Old tiles and wall design.Process of removing old tiles, old bathtub, old toilet and flooring (P1-P6)After (A1-A14). Project Completion.